Impact of a new slab thickness on Mechanical Systems

The intended redesign in steel of the Generic Building Name will result in an addition of beams and girders in the ceiling cavity space. The mechanical system will have to be altered to fit the space constraints Therefore a short analysis of the duct work would be beneficial. An entire redesign of duct work is not part of this breath only a preliminary schematic layout.

Impact of steel on schedule

The Generic Building Name is being built in a region of primarily concrete construction. Therefore, a switch to a steel frame will affect the schedule and cost of the building. An analysis of the schedule would be a valid learning experience to learn the scheduling difference between concrete and steel construction.

Note:  While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Harry Baker. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

© 2023 by Under Construction. Proudly created with Wix.com

bottom of page